I am looking to wire a sub-panel in my barn to support a general workshop.  Loads would include standard woodworking tools (including 220V table saw), welding, air compressor, etc.



The house has 200AMP main breaker and minimal in-house loads.  Dryer is gas, Oven and cooktop are gas.  Water heater is off the oil furnace.  I think the biggest single load is the well-pump and/or fridge compressor.  We do have sporadic toaster oven, hairdryers etc.  Otherwise its just lights, ceiling fans, flat-panel tv, stereo...



We had 4" conduit installed to the barn, so there is plenty of room to pull a big cable.  The entire run from the house panel to the barn totals around 155' (probably less, but rounding up)



My questions a



Can I pull a 100AMP sub-panel from my main house panel as described?


Would 4/0,4/0,4/0,2/0 aluminum service entrance cable be a good choice for this run?  Could I do it with something lighter?


Could I put an additional sub-panel in the garage (about halfway to the barn) by interrupting the run?  The garage subpanel would have a 220V plug for possible welding and/or electric car charging.  Would this require a separate run?


Are there any other considerations I should be thinking about in planning this?




Thanks for any thoughts you can share on this! 



Cheers,



pete
      


Similar Tutorials

How to Lay Sod - The Right Way!
   - Make sure the green side faces up! And, there are a few more steps if you want to ensure a nice looking lawn. Prepa ...
The Difference Between Volts, Amps, and Watts
   - This article explains the difference between Volts, Amps, and Watts in an easy-to-understand non-scientific way. T ...
Water is Leaking from the Toilet – What do I do? (How to replace the wax seal for a toilet.)
   - If there is water leaking from the toilet, you need to make sure that you know from where the water is leaking. Che ...


Similar Topics From Forums

Need to run wire for automatic horse waterers (1.3 amps each) to an open field about 350' away from the barn.



Ran 14/2 UF wire to 3 waterers inside the barn.

350' away from barn, is #10 wire OK for such a small load (1.3 amps for each waterer - 3 waterers in the field)? or do I need #8?



In the field, need to run to 3 separate wateres, so I think I need a subpanel out in the field...

How do I install the subpanel in an outdoor setting & what materials do I need?

If #10 wire is ok, I need 10/3 UF to run from the main panel to the subpanel - correct? Also, does the entire run need to be in conduit?

What size conduit if needed?

Is 18" deep enough?



What size breaker at the main panel?

What size breaker at the subpanel?--> only need to run 3 waterers (1.7 amps each) and maybe two separate circuits of outdoor receptacles...

What else is needed here? type of outdoor subpanel, grounding rods, etc...????



Thanks for the help!
      
Quick question - the electrician that installed 200 amp service to my horse barn has a grounding rod laying in the ground horizontally.



It is a 4' rod buried about 30" down and about 2 feet off the outside wall of the barn...laying horizontally (not driven into the ground).



Do I need to correct this???? (only came across this when I was installing insulation around the perimeter of the barn 24" underground).
      
Getting ready to replace my well jet pump with a 240 volt model (currently I use a 120 volt pump. Currently I have a 20 amp, 120 volt circuit that runs from the house to the pump house about 60 feet. I use that circuit for the pump, a light and a receptacle. I want to replace that circuit with a 20 amp MWBC using 12/3 UF cable from the sub panel in my detached barn to the pump house (about 20 feet).



Question: Can I use 1/2" seal-tite to run from the sub panel to a a junction box prior to going underground with the 12/3 UF? The seal-tight run would be about 30". (I have a bunch of seal-tite, connectors and #12 THWN that I bought cheap at a storage unit auction.) The seal-tite would be run in the stud bay and along side the ceiling joist to get from one side of the barn to the other.



Question: Can I use an unfused air conditioning disconnect at the pump house to disconnect the 2 ungrounded conductors of the MWBC.



I can find nothing in the NEC that would bar either of these items, but I am a code novice.
      
I want to set up a hobby woodworking shop in my garage. I was going to run from the panel maybe four or five 12/2's to accommodate lighting, power tools, dust collection, etc. or should I put a subpanel 60 to 100 amp? The main panel is on an outside wall on one side of the house and the garage is on the opposite side of the house. The distance from the panel to the entry into the garage is about 50 ft. I would be pulling wire- a straight run- through a ceiling chase that runs the length of the house. No basement.
      
In a large bunkhouse we need to add a second range, water heater, and kitchen outlets.  The existing panel is 125 AMP (with breaker), and don't want to redo entire panel.  A consultant said to install a 200 AMP drop, with a panel to handle the additional load.  Would you then feed each of the panels from that drop as main panels, or use a new 200 AMP panel as the main, and the 125 as a sub-panel from that?  I assume in either instance, the grounding would be done as a 200 AMP service.  Just realized if each was a main panel, the new one couldn't exceed 75 Amps, or total would be over 200.  Any other ideas appreciated.
      
Live in California...  Pool and backyard remodel



Running a new 100Amp line from the main electrical house box that is 200amp to the new Hayward ProLogic Pool sub panel for the pool equipment. Is that #2 wire or #4?



The pool installers are telling me that they need 50 amps for the 3 pumps, 2 pool lights and gas heater that I have. 



The reason that I'm running 100amps to the sub panel and only using 50amps for the pool is because there is electrical going to the overhang and backyard that can be controlled by a remote that talks to the ProLogic sub panel.



I have a overhang/BBQ area that has 17Amps for the refer and BBQ, a water feature which is about 15-20 amps, 2 ceiling fans for the overhang, low-voltage lights for the overhang, low-voltage landscaping lights for the backyard only. I think that is about it.



Inspector is telling me that I need a GFCI at the sub panel. Is this a 100amp GFCI prior to the sub panel being wired? Or does each piece of equipment need a GFCI?



I am having a licensed electrical contractor do this, but I'm just trying to do my homework because some of them are not knowledgeable about pool wiring... 

(BTW, I had a licensed contractor out yesterday, to give me a bid and he said that they didn't make a 100amp GFCI, which of course I did see on the internet, not using him!!)
      
My existing service entrance consists of an external Meter can mounted on the outside of the garage wall directly behind a SD Main Breaker Panel (MBP) with a 150 amp main breaker.  In order to support upgrades, I am installing a second MBP (200 amp) inside the garage in the wall cavity right next to the existing panel.



Local code requires that the upgraded Meter can be purchased from the City Utility.  I have already confirmed with the local inspector that either 4/0 Al or 2/0 Cu SE cable are acceptable for both the existing and new MBP.



My question is what is the code requirement for getting the 3 SE cables run from the dual lugs to the new panel?  Can those conductors run into the same wall cavity where the existing panel is installed?  If so, I'm certain they can't go through the same conduit nipple that connects the back of the meter can to the existing MBP.  Can they route in behind/above/below the existing panel and through a hole in the wall stud to gain access to the adjacent stud bay to get to the new panel?  If not, do they need to be routed out of the meter can on the external wall in conduit over to the next stud bay and then enter the wall there to gain access to the new panel?  If external conduit is required I would expect it must be metallic as opposed to PVC.



Best Regards,



Ted
      
I'm having quite the time finding an electrician who will quote this.  Just about all of them say that what I need is to upgrade my main panel but I want to install a new main panel that is a part of the meter base outside and make my current 100A panel a sub.   Maybe you people can tell me why nobody seems to want to do this.  Here are a few shots of the existing meter (note what is apparently a 60A base here)






and a shot of the conduit headed underground.  Like most homes built during this era, the conduit makes a right turn underground to enter through the cinderblock, ending up coming into the back of the main panel.  This conduit encloses a 4 wire feed. edit: no, actually it is only a 3 wire feed which is a problem if I want to convert the original main panel a sub.






Here's the existing panel.  It's a 60's era Square-D split panel with a 30 amp sub panel for the finished basement.  Those are low voltage wires to circuit taps for my home energy monitoring system btw.






The reason I don't want to upgrade this panel are as follows:

We won't be expanding the electrical west of this panel any more.  All planned expansion (240v car charger in Garage, planned 3 season room with grid tie Solar on the roof) will be to the east.


Upgrading the panel will require major surgery to the walls.  Due to the way the original basement is engineered there, the walls have an intricate stud pattern behind the existing panel.  I'd pretty much have to rip out a 4' section and redo it to make the access large enough to handle a 200A panel.


Adding additional circuits to an upgraded panel will require an act of God due to the finished basement construction.  There are no raceways for additional circuits.






Based on this, my thoughts were to create a new 200A main panel outside based on something like the GE model TSM420CSCUP loadcenter.  Here's a shot of this panel:






This particular panel has room for three 2-pole breakers in addition to the 200A mains.  I'd add a 100A 2-pole breaker for the existing panel, with the other two reserved for the garage/solar expansions.



The issue with the contractors who have quoted the job appears to be the conduit going to the existing panel.  I'm not sure what's wrong with it but it is apparently not compliant with current code.  Obviously the bonding needs to change, new grounding electrodes need to be driven, and a water pipe ground needs to be established to the new main panel, but what else is required?



I'd like to throughly research all the code considerations here so I can approach a contractor from a more knowledgable perspective then determine the best way to perform this upgrade.  Due to POCO coordination and the need to cut household power for the duration of the job, I have no desire to DIY this one...



So what exactly is wrong with the conduit running from the existing meter base to the existing load center?  Why is everybody telling me that I can't do essentially what I've described above?  What are the relevant code sections that will apply to this job?  Should I be chatting with my AHJ about local considerations now or should I wait until I have the code requirements down pat (assuming the latter here)?
      
I have 200 amp service with a 50 amp service tap to the garage and another 50 amp tap to a small service panel for extra circuits. I have a 70 amp draw for a tankless water heater, 30 amp draw for the air conditioner, a 40 amp draw for the cooktop and a 40 amp draw for a double oven. I want to add another tankless water heater about 50 feet from the 200 amp panel. The new water heater requires three 50 amp breakers. How do I get the necessary service to the new water heater?
      
We are in the process of redoing the area around our pool. As part of this we are adding a pool house and hot tub (separate from pool).



I have a couple Elecrtical Contractors coming out this weekend to price/put together a plan. Along with talking to several indivuals, I've been lurking around reading and trying to gather info but feel the need to have as much info available prior to getting these estimates and plans. Please excuse any incorrect verbage i might use and appreciate any corrections to my terminoligy



So this is what i have 



The pool house is approx 100 ft from the house.

It will have a few and outlets for blenders, minifridge, tv etc

the pool equipement consites of a pump, heater and a sand filter. The pump and current heater run off standard 110 lines (however if i upgrade this I dont know if the new one will require a 220 line



The pool light seems to run off a standard line as well



The hottub requires a 220 40amp line



There will be landscaping lighting as well as 2 more outlets for accesories



The original setup prior to last year had what looks like 6 or 8 guage (3 wire) directly buried about 6-8 inches under  ground. it was running what look to be two 20amp circuits from the main panel inside the house. This wire got split to two separate outlets near the pool. One went directly to the pool equipment and on directy to the pool light switch and some landscaping ighting.



With all the enhancements we are making i'm wondering what the best approach will be.



I assume a sub panel in the pool house that has one "main breaker" and has its own ground. Then one run to the pool equipment and one run to the hottub and a couple runs to the accesories i mentioned.



I have seen several replies on here where individuals talk about  "if they were doing the job this is how they would do it". Id be interested in some responses



What type of wire would be best to get it to the pool house

Does it run right from the main panel in the house?

Does direct burial make sense or shold i put it in conduit? I'm already digging a trench three feet deep for water and RG6 (which will be pushed thru conduit)



Any question i should make sure i ask the contractors?





Thanks in advance for any input